RR-24-4985 - Pavement & Structural Rehabilitation & Plaza Improvements

The work under this contract includes bridge concrete sealing and joint repairs, substructure repairs, bridge painting, drainage system repairs, lighting improvements, overhead sign structure repairs, culvert and pavement repairs, shoulder microsurfacing, removal and replacement of raised pavement markers, crack repairs, pavement marking, toll plaza canopy removal, toll plaza monotube construction, removal of toll plaza equipment, plaza electrical work, signing improvements, landscaping, and maintenance of traffic.

Status

Accepting Bids

Prebid Date 2/27/25 2:00pm CST
Bid Date 3/27/25 10:30am CDT

Company

Illinois Tollway

Location

The location of the services to be performed for this contract is the Jane Addams Memorial Tollway (I-90) between Mile Post 12.5 and Mile Post 30.0 in Winnebago and Boone Counties, Illinois

Questions pertaining to the intent of the contract documents may be sent to the Illinois Tollway, attention 4893D.4985_Questions@docs.e-builder.net, to be received no later than 2:00 p.m. local time on March 6, 2025.

BID DUE DATE:
Thursday, March 27, 2025 - 10:30AM
Electronic Bids ONLY via BidBuy, the State of Illinois eProcurement System

For assistance with registering in BidBuy or submitting electronic bids, please contact the BidBuy Vendor Help Desk at: il.bidbuy@illinois.gov and /or phone: 866-455-2897

PRE-BID MEETING: OPTIONAL
Thursday, February 27, 2025 - 2:00PM
Via Microsoft Teams
Register & Join Event:
https://events.gcc.teams.microsoft.com/event/d00d5287-8355-4f47-b9dd-ee78d5183e5f@48475f88-04d3-4aa6-ae94-21dcfec788aa
Meeting ID: 287 936 243 322
Passcode: Np3Ps27t

Audio Conference:
Call the number below and enter the access code.
+1 872-240-8046,,127977701# United States, Chicago
Phone conference ID: 127 977 701#

Bidders are responsible for the purchase of Complete Printed Sets and Complete Set Downloads

In the event there is a discrepancy between the electronic and hard copy documents distributed by the on-line plan room, the printed documents take precedence