I-24-4965 - Plaza Improvements & Bridge Rehabilitation

The work under this contract includes partial demolition, reconstruction, and conversion of plazas to all electronic; earthwork; bridge rehabilitation for the I-294 ramp bridge over Golf Road (BN 317); installation of plaza monotubes, pavement marking, signing, lighting and Intelligent Transportation Systems equipment; drainage improvements; bituminous asphalt paving; concrete paving; precast control building installation; maintenance of traffic and other miscellaneous work.

Status

Accepting Bids

Prebid Date 10/16/24 2:00pm CDT
Bid Date 11/14/24 10:30am CST

Company

Illinois Tollway

Location

The location of the services to be performed for this contract is the Tri-State Tollway (I-294) at Mile Post 45.2 in Cook County, Illinois.

Questions pertaining to the intent of the contract documents may be sent to the Illinois Tollway, attention
4894D.4965_Questions@docs.e-builder.net, to be received no later than 2:00 p.m. local time on October 24, 2024.

BID DUE DATE:
Thursday, November 14, 2024 - 10:30AM
Electronic Bids ONLY via BidBuy, the State of Illinois eProcurement System

For assistance with registering in BidBuy or submitting electronic bids, please contact the BidBuy Vendor Help Desk at: il.bidbuy@illinois.gov and /or phone: 866-455-2897

PRE-BID MEETING: OPTIONAL
Wednesday, October 16, 2024 - 2:00PM
Via Microsoft Teams
Register & Join Event:
https://events.gcc.teams.microsoft.com/event/242a9c70-3bf7-40d5-a37c-024778f71295@48475f88-04d3-4aa6-ae94-21dcfec788aa
Meeting ID: 219 325 765 396
Passcode: mr2wc4

Audio Conference:
+1 323-486-3157,,474027435# United States, Los Angeles
Phone Conference ID: 474 027 435#

SITE VISIT: OPTIONAL
Thursday, October 17, 2024 – 10:00AM
Plaza 28A Northbround Entrance from Golf Rd.
Des Plaines, IL
Additional information is listed in the A-3 page

Bidders are responsible for the purchase of Complete Printed Sets and Complete Set Downloads

In the event there is a discrepancy between the electronic and hard copy documents distributed by the on-line plan room, the printed documents take precedence