I-24-4965 - Plaza Improvements & Bridge Rehabilitation

The work under this contract includes partial demolition, reconstruction, and conversion of plazas to all electronic; earthwork; bridge rehabilitation for the I-294 ramp bridge over Golf Road (BN 317); installation of plaza monotubes, pavement marking, signing, lighting and Intelligent Transportation Systems equipment; drainage improvements; bituminous asphalt paving; concrete paving; precast control building installation; maintenance of traffic and other miscellaneous work.
01_A-1 Page (click to expand/collapse)
Name Size
I-24-4965_A-1 Page_10012024 190.2 KB
02_P-Pages (click to expand/collapse)
Name Size
I-24-4965_P-Pages_10012024.xlsx 228.4 KB
03_Specifications (click to expand/collapse)
04_As-Built (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
CIP-97-986_P1_R 11.1 MB
CIP-97-986_P2_R 21.1 MB
I-07-5241_R_V1_201134 29.5 MB
I-07-5241_R_V2_201134 24.6 MB
I-07-5241_R_V3_201134 35.7 MB
I-07-5241_R_V4_201134 9.2 MB
I-07-5242_R_V1_201134 67.3 MB
I-07-5242_R_V2_201134 33.5 MB
I-07-5242_R_V3_201134 103.8 MB
I-07-5242_R_V4_201134 11.2 MB
I-07-5242_R_V5_201134 33.6 MB
I-07-5242_R_V6_201134 69.8 MB
RP_AVE_GP_4965-FinalDrainageReport_09232024 37.8 MB
RP_GSG_TC_4965-HazBuildingMaterialsSurveyPlaza28_08162024 10.6 MB
RP_GSG_TJC_4965-Plaza28EsaRpt_08292024 41.5 MB
RP_GSG_TJC_4965-Plaza28Lpc663_08292024 5.9 MB
05_GeoTech Suppport (click to expand/collapse)