RR-24-4978 - Drainage Improvements
The scope of the work shall consist of cleaning storm sewers, culverts, and drainage structures; cleaning and regrading ditches at locations shown on the plans; landscaping and erosion control for the areas shown on the plans; maintenance of traffic; and other miscellaneous work
01_A-1 Page
(click to expand/collapse)
Name | Size | |||
RR-24-4978_A-1_Page_11012024 | 109.2 KB |
02_P-Pages
(click to expand/collapse)
Name | Size | |||
RR-24-4978_P-Pages_11012024.xlsx | 60.4 KB |
03_Specifications
(click to expand/collapse)
Name | Size | ||
RR-24-4978_ContractBook_Vol1 | 1.4 MB | ||
RR-24-4978_ContractBook_Vol2 | 1.4 MB |
04_As-Built
(click to expand/collapse)
Name | Size | |||
I-07-5221_R_V1_2010826 | 28.2 MB | |||
I-07-5221_R_V2_2010819 | 9.7 MB | |||
I-07-5222_R_V1_20111017 | 34.8 MB | |||
I-07-5222_R_V2_20111017 | 7.5 MB | |||
I-07-5226_R_V1_2011114 | 58.3 MB | |||
I-07-5226_R_V2_2011114 | 30.0 MB | |||
I-07-5227_C_V2_2012314 | 131.2 MB | |||
I-07-5227_R_V1_2012314 | 179.6 MB | |||
I-07-5228_R_V1_20091228 | 64.2 MB | |||
I-07-5228_R_V2_20091228 | 7.2 MB | |||
I-07-5229_R_V1_2011615 | 59.0 MB |