RR-24-4978 - Drainage Improvements

The scope of the work shall consist of cleaning storm sewers, culverts, and drainage structures; cleaning and regrading ditches at locations shown on the plans; landscaping and erosion control for the areas shown on the plans; maintenance of traffic; and other miscellaneous work
01_A-1 Page (click to expand/collapse)
Name Size
RR-24-4978_A-1_Page_11012024 109.2 KB
02_P-Pages (click to expand/collapse)
Name Size
RR-24-4978_P-Pages_11012024.xlsx 60.4 KB
03_Specifications (click to expand/collapse)
04_As-Built (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
I-07-5221_R_V1_2010826 28.2 MB
I-07-5221_R_V2_2010819 9.7 MB
I-07-5222_R_V1_20111017 34.8 MB
I-07-5222_R_V2_20111017 7.5 MB
I-07-5226_R_V1_2011114 58.3 MB
I-07-5226_R_V2_2011114 30.0 MB
I-07-5227_C_V2_2012314 131.2 MB
I-07-5227_R_V1_2012314 179.6 MB
I-07-5228_R_V1_20091228 64.2 MB
I-07-5228_R_V2_20091228 7.2 MB
I-07-5229_R_V1_2011615 59.0 MB