I-24-4981 - Southbound Entrance Ramp Construction

The scope of the work shall consist of roadway pavement removal and construction, retaining wall construction, drainage system removal and construction, erosion control, landscaping, roadway lighting, pavement marking, signing, protection and relocation of utilities, and maintenance of traffic

Status

Accepting Bids

Prebid Date 12/19/24 11:00am CST
Bid Date 1/30/25 10:30am CST

Company

Illinois Tollway

Location

The location of services to be performed is the Tri-State Tollway (I-294) between Mile Post 19.4 and Mile Post 20.6 in Cook County, Illinois

Questions pertaining to the intent of the contract documents may be sent to the Illinois Tollway, attention
4383MP.4981_Questions@docs.e-builder.net, to be received no later than 2:00 p.m. on January 9, 2025.

BID DUE DATE:
Thursday, January 30, 2025 - 10:30AM
Electronic Bids ONLY via BidBuy, the State of Illinois eProcurement System

For assistance with registering in BidBuy or submitting electronic bids, please contact the BidBuy Vendor Help Desk at: il.bidbuy@illinois.gov and /or phone: 866-455-2897

PRE-BID MEETING: OPTIONAL
Thursday, December 19, 2024 - 11:00AM
Via Microsoft Teams
Register & Join Event:
https://events.gcc.teams.microsoft.com/event/796d3fc2-76c5-4402-a5dc-bbc217216541@48475f88-04d3-4aa6-ae94-21dcfec788aa
Meeting ID: 237 080 116 093
Passcode: nF6fy7dm

Audio Conference:
Call the number below and enter the access code.
United States, Los Angeles
+1-323-486-3157
Phone Conference ID: 776 942 338#

VIRTUAL BID OPENING:
Thursday, January 30, 2025 - 10:30AM
Webinar link is as follows:
https://events.gcc.teams.microsoft.com/event/a379e97c-e89f-45af-874a-f6ef8ed48e7f@48475f88-04d3-4aa6-ae94-21dcfec788aa
Meeting ID: 238 147 668 999
Passcode: 5zQ6Ws9r

Or call in (audio only):
+1 323-486-3157, 457629903# United States, Los Angeles
Phone Conference ID: 457 629 903#

Bidders are responsible for the purchase of Complete Printed Sets and Complete Set Downloads

In the event there is a discrepancy between the electronic and hard copy documents distributed by the on-line plan room, the printed documents take precedence