I-24-4981 - Southbound Entrance Ramp Construction

The scope of the work shall consist of roadway pavement removal and construction, retaining wall construction, drainage system removal and construction, erosion control, landscaping, roadway lighting, pavement marking, signing, protection and relocation of utilities, and maintenance of traffic
01_A-1 Page (click to expand/collapse)
Name Size
I-24-4981_A-1 Page_12122024 108.3 KB
02_P-Pages (click to expand/collapse)
Name Size
I-24-4981_P-Pages_12042024.xlsx 88.2 KB
03_Specifications (click to expand/collapse)
04_As-Built (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
I-18-4391_R_V1_2021921 59.0 MB
I-18-4391_R_V2_2021921 21.0 MB
I-20-4518_R_V1_20230609 90.2 MB
I-20-4518_R_V2_20230609 58.4 MB
I-20-4518_R_V3_20230609 69.9 MB
I-20-4518_R_V4_20230609 48.7 MB
I-21-4594_DW_CBBEL_4594-PlansUpdatedWith2Addenda,CR1-13,ISU3,32,33_04262024 70.3 MB
RP_H&H_JJR_4594-88thAve-at-I294_PreliminarySiteInvestigation_08172021 62.7 MB
05_Geotechnical Information (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
RP_TSC_TRP_4383-RGR-L-90,337_03032023 4.0 MB
RP_TSC_TRP_4383-SGR-WallReportL-90,337F_07022020 1.4 MB