RR-23-4900 - Plaza Improvements

The work under this contract includes ramp pavement and shoulder replacement; removal of the existing toll plaza median islands, equipment, and canopies; structure demolition; barrier wall construction; installation of toll plaza monotubes, lighting, pavement marking and signing; toll plaza electrical work; landscaping, erosion control, and maintenance of traffic
01_A-1 Page (click to expand/collapse)
Name Size
RR-23-4900_A-1 Page_03032025 133.9 KB
02_P-Pages (click to expand/collapse)
Name Size
RR-23-4900_P-Pages_02142025.xlsx 121.7 KB
03_Specifications (click to expand/collapse)
04_Geotech (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
RP_GSG_DE_4900-GeotechnicalRptPlz34_02062025 5.2 MB
RP_GSG_DE_4900-GeotechnicalRptPlz38_02142025 8.3 MB
RP_GSG_DE_4900-GeotechnicalRptPlz40_02062025 3.4 MB
05_Other Reports or As-Built (click to expand/collapse)