RR-23-4900 - Plaza Improvements
The work under this contract includes ramp pavement and shoulder replacement; removal of the existing toll plaza median islands, equipment, and canopies; structure demolition; barrier wall construction; installation of toll plaza monotubes, lighting, pavement marking and signing; toll plaza electrical work; landscaping, erosion control, and maintenance of traffic
01_A-1 Page
(click to expand/collapse)

Name | Size | |||
RR-23-4900_A-1 Page_03032025 | 133.9 KB |
02_P-Pages
(click to expand/collapse)

Name | Size | |||
RR-23-4900_P-Pages_02142025.xlsx | 121.7 KB |
03_Specifications
(click to expand/collapse)

Name | Size | ||
RR-23-4900_ContractBook_Vol1 | 7.9 MB | ||
RR-23-4900_ContractBook_Vol2 | 162.4 MB |
04_Geotech
(click to expand/collapse)

Name | Size | |||
RP_GSG_DE_4900-GeotechnicalRptPlz34_02062025 | 5.2 MB | |||
RP_GSG_DE_4900-GeotechnicalRptPlz38_02142025 | 8.3 MB | |||
RP_GSG_DE_4900-GeotechnicalRptPlz40_02062025 | 3.4 MB |
05_Other Reports or As-Built
(click to expand/collapse)
